I could not be happier with my ET Manager. Since its installation, I have saved literally thousands of litres of water and therefore a sizeable, and welcome, chunk of change. Not only that, my landscape has never looked better. The system is fantastic and now that I’ve seen it in action, I don’t think I could live without it.

- Ron Orr, Homeowner, Gleneagles, Cochrane
Proven Savings


  • Commercial Properties
Property Name savings period with ET (yrs) 2009 Water Savings (l) Cumulative Water Savings (l) Total Water Cost Savings ($) Return on Investment (yrs)
Deerfoot Meadows 2 yrs 8,228,772 16,374,060 $25,804.31 0.60
Southcentre Mall 3 yrs (2006 – 2008) Mall Expansion 2009 12,723,905 $17,947.74 1.20
Shaw Cable – Barlow Operations 4 yrs 4,314,865 12,942,550 $19,352.20 0.45
Beattie Homes HO 4 yrs 1,070,923 3,306,487 $5,678.19 1.40
Real Canadian Superstores
Southport, 4 yrs
Sunridge, 3 yrs
South Trail Crossing, 3 yrs
1,950,938
1,400,901
1,966,599
6,829,391
5,440,415
6,599,550
$10,234.12
$8,531.89
$11,401.34
1.60
1.50
1.50
Alberta Infrastructure
Alberta Research Council, 3 yrs
2,359,746 5,674,393 $7,199.77 1.90
CBRE – Hibbert Building 4 yrs 634,129 2,106,800 $3,219.48 2.20
Tonko Realty Advisors Ltd.
4069 112 Avenue SE, 1yr
7505 48 Street SE, 1yr
7151 44 Street SE*, 1yr
5820 48 Street SE, 1yr
7139 44 Street SE*, 1yr
*small 4 zone irrigation system
1,583,340
1,687,180
673,600
1,596,220
384,240
 
1,583,340
1,687,180
673,600
1,596,220
384,240
 
$2,565.17
$2,733.40
$1,091.30
$2,586.04
$622.51
 
1.05
1.16
2.21
1.10
3.88
 

  • Church Properties
Property Name savings period with ET (yrs) 2009 Water Savings (l) Cumulative Water Savings (l) Total Water Cost Savings ($) Return on Investment (yrs)
St. Mary’s Cathedral 3 yrs 891,913 2,547,225 $3,915.81 1.90
Free Methodist Church 3 yrs 1,206,966 4,637,335 $7,046.07 0.80

  • Condominium Properties
Property Name savings period with ET (yrs) 2009 Water Savings (l) Cumulative Water Savings (l) Total Water Cost Savings ($) Return on Investment (yrs)
The Renaissance Villas 4 yrs 1,780,750 6,593,944 $9,861.11 1.20
Mt Douglas Peaks 4 yrs 2,495,767 9,300,201 $13,957.61 1.30
Chelsea Station 4yrs 2,899,032 10,240,477 $15,324.07 0.60
Springside Villas 4 yrs 1,175,897 8,266,710 $12,142.24 0.80
Inglewood Grove 3 yrs 4,737,992 14,831,928 $22,557,68 0.60
The Terraces North 2.5 yrs 3,203,511 9,636,222 $14,800.13 0.90
Wentworth Villas 2 yrs 1,904,760 3,640,800 $3085.90 0.80
Tuscany Pointe 1 yr 3,313,530 3,313,530 $5,368.25 0.94

Note: These are the documented water savings during a typical irrigation season (May-Sept.) with Climate Controlled Irrigation compared to traditional timer based watering. Water cost savings are based on City of Calgary irrigation water meter rates of $1.3628/m³ in 2006, $1.44/m³ for 2007, $1.5313/m³ for 2008, and $1.6201/ m³ for 2009. City of Calgary irrigation rates are increasing to $1.7141/m³ for 2010 and $1.8136/m³ in 2011. ROI is based on water rates at the time and year of installation. Usage amounts have been converted from m³ to litres for demonstration purposes. ET losses in 2006 were 29% righter than average and July of 2007 was the hottest and driest month on record in 47 years. Residential dollar savings are based on 2009 City of Calgary Residential Water/Sewer rates of $1.8868/m³.